Been doing some studying on restoring rail service to the Interurban. I see its long term value as a commuter rail route that will facilitate far better movement between towns and city cores in the Valley, but still enabling long distance travel east to Chilliwack or west to Vancouver. The advantage of standard at-grade rail has always been its flexibility and cheap price, so I don’t like the idea of immediately making it into an LRT system. Besides, LRT is more suited for an urban setting with high densities - something that, truthfully, isn’t the strengths of most communities along the Interurban’s route (as compared to other areas of the Valley).
In any case, there are many arguments against restoring service, from cost to population density to competition with planned BRT routes - however, these are obviously excuses. If there’s the political will to get something done, it will get done.
As of this moment, at my current understanding of the problem, there’s a few things going on.
- The FVHRS is restoring an original Interurban vehicle to run as a historic/tourist train between Cloverdale and Sullivan. They are years behind schedule, and won’t likely be done the restoration until late 2009.
- TransLink does not support restoring rail service on the route because it cannibalizes its current transit expansion plans for the Valley. All public transport must be either run, or have the approval, of TransLink.
- As much as it would like to bring rail back, the City of Surrey does not have the capital funds to upgrade the route for, even community, rail service - let alone a real, strong, regional transit connection. Thus it is pursuing partnerships, and providing limited funding, to help FVHRS get it’s historic/tourism train off the ground.
- The federal government is doing a review of allowing passenger service along national rail corridors that could impact any rail revival attempts.
So, what is the estimated cost to bring back the Interurban?
Well, according to the UMA Study done for the City of Surrey:
…operating an accessible, modern Community Rail service every 20 minutes during peak weekday periods between the Cloverdale and Scott Road Stations, with a connection to the Scott Road SkyTrain Station on a single track with sidings, with some limited double track sections in the station areas in order to provide accessible service, and a signal and communications system for the corridor. The high order of magnitude cost estimate for this service is projected to have a total capital cost range of approximately $80.0 million (i.e. using British Parry People Mover vehicles) to $110.0 million (i.e. using Talent LRT vehicles) and an annual operating cost of approximately $6.0 million. This is on top of the $9.0 million capital cost sunk for Phase One, noted above bringing the total capital cost for Phase Two range to $90.0 to $120.0 million range.
The capital costs include the following components: right-of-way and grade crossing improvements; passenger stations; adding vehicle storage and maintenance facilities and track access to the maintenance/storage facility at Sullivan Station; modifying some industrial sidings; double tracking the station areas to ensure physical separation of right and passenger services; providing adjacent station parking and pedestrian access improvements;providing new LRT- like vehicles; installing fare revenue collection equipment; and implementing a train communication and signal system to ensure safety of the system.
Course, running peak service is rather retarded. I mean, yes, it will aid a few of us who travel downtown, but it certainly doesn’t help the majority of residents who travel, throughout the day, *in* the South of Fraser area. That’s why I liked the old Interurban timetable I found. Service wasn’t at super high frequencies like that of the SkyTrain, but it was more than peak periods - it was a couple runs throughout the day. And it had specials for the weekends!
According to the UMA Study, Southern Railway currently only runs…
… up to four freight trains daily (two in each direction). One train usually leaves from their New Westminster yard about 4:00 pm or 5:00 pm going eastward and returns westward to New Westminster between 10:00 pm and 12:00 am. Another train leaves the New Westminster yard between midnight and 1:00 am and returns to their New Westminster yard between 6:00 am and 7:00 am depending upon the level of coal/freight traffic moving on the main freight rail service line out of the region.
So, theoretically, there’s no reason we couldn’t run service beyond peak periods. Seems like the busiest times for the route are around 12am. And I can actually testify for this, considering I can hear the train when it runs through Cloverdale, a couple of blocks from where I live.
I truly believe that it’ll take a real pilot project, where people can get on a train and ride it along the route, to really bring the community support out in droves. I suppose that’s kind of what the City of Surrey is trying to do by supporting the FVHRS’ initiatives. However, I have a different idea.
So, based on what we know, here’s the times the tracks are busy:
- 4 pm - 5 pm
- 10 pm - 1 am
- 6 am - 7 am
Now, TransLink already has a commuter rail system - the West Coast Express. It’s my understanding that that service has five actual trains, with god knows how many cars that are attached to each “set”. They are used in peak periods on weekdays only.
So, here’s my proposal:
TransLink should take a West Coast Express train after rush hour Friday night, and plop it down in the railyards in Surrey near the Patullo Bridge. Then, starting from 7 am to 4 pm, run the service, up and down the route.
Theoretically, if it takes about 40 mins from New West to Cloverdale, you could create a timetable that would have the train coming back to each stop, every hour, in an alternate direction. Take a look:


Let the freight go by from 4 to 5, and then put it back on for evening service. Do this all weekend. See how it goes. Watch for the reception it gets.
And you wouldn’t have to spend a penny. Maybe get some wooden step stools to get on and off the train. And make it free. Let families hop on and take the route roundtrip depending on their departure point. Let people take surveys of the service. Have sketches showing what a possible rail system would look like.
We have the train. We have the time. We have the initial agreements from Southern Railway.
Let’s make it happen. Once people see how revolutionary this would be for Surrey, and the possibilities it opens up to the whole Fraser Valley, the campaign to bring back rail will be unstoppable!