Dave left a comment on my Transit Metropolis Vancouver post, challenging me to take it beyond a vision and to figure out if it is viable as a real plan, and how much it would cost. I didn’t quite fulfill that exact challenge, but combined it with the latest SkyTrain expansion plans in Surrey, and came out with this.

It’s a 14 paged document outlining what LRT is, why we shouldn’t build SkyTrain in the South Fraser area, and how much it would cost to build three LRT lines out here.

Surprisingly enough, the final estimate, based on a cost of $24 million per kilometre, three LRT lines totaling 100km in the South Fraser area could be built for $2.5 billion.

Considering that the SkyTrain extensions, tentatively set for completion between 2020-2030, will likely total nearly $5 billion by then, with only 22.7 kilometres of rail rapid transit.

I think the business case is clear. Check it out [PDF] and let me know what you think in the comments! :)